—— An embedded component supplier's view of an industry that stalled
Abstract: one judgment, four checks, three corrections
This report starts from an internal judgment of ours: the smart restroom market is not healthy — it rotted before it grew up. The industry fell into price competition before it had entered healthy competition on products and technical proposals, and it landed on “having it is enough, passing acceptance is enough, collecting payment is enough,” with after-sales ignored and actual results ignored.
We split that sentence into four parts and checked them separately against government-procurement award notices, the bid-evaluation and warranty clauses in tender documents, local governments' operations-and-maintenance unit prices, public reporting after the facilities were built, and the “competitive landscape reports” published by the industry. The result of the check: two points hold completely. The other two are basically right in direction, but the wording needs correction. The corrected conclusion is colder than the original judgment.
- “The market is not healthy” — it holds, with high confidence. The party that pays (public finance), the party that operates (the sanitation company), and the party that uses it (the citizen) are three separate parties. None of them pays for “results.” This is a structural problem, not a problem of practitioners' character.
- "It rotted before it grew up" — the direction is right, but the more accurate statement is "it never grew up." On a checkable basis, the “smart” layer is only 3—10 hundred million yuan a year (5%—15% of the cost of a whole public toilet; it was always a side dish). Nearly a hundred registered firms, plus countless integrators, divide it. The top five together are under 28%. A leader's annual revenue does not exceed 2,500 ten thousand yuan, while a 15-person hardware team costs 300—450 ten thousand yuan a year, and a platform takes 1,200—1,800 ten thousand yuan over three years. At this size, the arithmetic cannot feed any company that does real R&D. It did not grow up and then go rotten. It never reached a size that can sustain a technology investment.
- “It competed on price before it entered technical competition” — this needs correction. Technical competition did happen: the sensing layer went through three generations in six years, infrared → laser TOF → millimeter-wave. It converged within four years, because technical differences have no scoreboard — the client cannot obtain, and does not require, verifiable result indicators. A contest with no scoreboard ends as a contest of who quotes lower. One of our own service-area projects quantifies this “low”: in 2023 the smart portion was on the order of 30 ten thousand yuan, with about 150 stalls on both sides; in 2025 a job of the same scale had fallen to about 10 ten thousand yuan — two-thirds gone in two years, while the cost of the same configuration did not fall by one fen. Quoted at 10 ten thousand yuan and built with nothing cut, the back-calculated cost is 18.6 ten thousand yuan, a gap of 8.6 ten thousand yuan. Per stall, the quote is 667 yuan and the cost is 1,240 yuan. (Section 06.) While the price fell, the list fell with it: the smart restrooms on a Guangzhou Metro extension are left with only occupancy sensing and smoking detection, against nine items three years ago (Section 08). A lower price on the supply side and fewer items on the demand side are two sides of the same thing.
- “Having it is enough, passing acceptance is enough, collecting payment is enough, after-sales do not matter, and results do not matter” — it holds, and there is physical evidence. The standard is a “configuration list” (the Shanghai guidelines: 61 items in three tiers). Acceptance is counting items and ticking boxes. The 7.8—14.9 ten thousand yuan a year spent to run a public toilet all sits in the “cleaning services” line. Not one character says “system operations and maintenance.” The contract clause after warranty says “provide spare parts at a preferential price,” not “continue operations and maintenance.” The result is that equipment starts to degrade within 18 months, and the direction of the degradation is the same — from smart back to manual.
Our conclusion
The problem of this market is not the product, the technology, or morality. It is the scoreboard: nobody can measure “results,” so the only things left to compare are “item count” and “price.”
Under the rules as they stand, continuing to make “a better product” is very hard to get paid for. The advantage of a good product is buried under the ticked boxes on the acceptance list, and a poor job can still pass acceptance. Only two moves actually work — either change the scoreboard, or step around the turnkey layer and make components.
We choose the latter, and we publicly argue for the former. This report is the account of those two things.
Contents
01Our original judgment, split into four sentences
Lay the words out first, then check them sentence by sentence. A vague judgment cannot be verified, and it cannot be refuted.
The original words were these:
That sentence contains four assertions that can be tested independently. We split them apart and give each a verdict:
The market is not healthy— if “healthy” here means “someone pays for results, results can be measured, and a good product can earn a premium,” then this sentence holds.
"It rotted before it grew upis not accurate enough either. “Rotted” implies that it was once healthy. What we found is that the industry never had such a stage. More accurately, it never reached a scale that can sustain a technology investment.
As for "it competed on price before it entered competition on technical proposals, technical competition did happen (three generations of sensing technology in six years), but it converged within four years, because there were no verifiable result indicators. It is not that nobody compared. It is that the comparison did not count.
Having it is enough, passing acceptance is enough, collecting payment is enough, after-sales do not matter, and results do not matter— institutional evidence can be found for all four, and “after-sales do not matter” has to be made precise: after-sales is squeezed to the boundary of the warranty, and after warranty there is no budget line that pays for it.
The next eight sections each take one piece of evidence as it stands, and state its source, its statistical basis, and what it can and cannot prove.
02Method: why we do not use the market-size figures in circulation
An industry that cannot even state its own market size has to be re-estimated from the materials underneath.
The first obstacle in this check was not that data could not be found. It was that there is too much data, and it contradicts itself. The same thing — a smart public-toilet system — differs by three orders of magnitude across sources:
| Source basis | Size figure | Converted to RMB |
|---|---|---|
| One international market study (global, 2025) | USD 1.39 hundred million | about 10 hundred million yuan |
| Another 2026 report (global) | USD 1.70 hundred million | about 12 hundred million yuan |
| One industry research institute (China, 2025) | 120 hundred million yuan | 120 hundred million yuan |
| Another batch of reports (global, 2025) | USD 248 hundred million | about 1,760 hundred million yuan |
Source: abstracts of multiple “smart public toilet / intelligent public toilet” market reports retrieved in public. All of the above are disclosed by the institutions themselves. Statistical basis and sample are not public.
Look at the third row. If China is 120 hundred million yuan a year and the world is only 10—12 hundred million yuan, China would be more than ten times the world. That is impossible in logic. Of these four figures, at most one can be right, and it is possible that none of them is.
This report therefore does not use these figures. It starts again from four layers of checkable material and estimates from the bottom up:
Layer 1: government statistics and departmental bulletins
The stock of public toilets, toilets per 10,000 people, the share at Class III and above, and fixed-asset investment in sanitation facilities. Used to fix “how big the pool is.”
Layer 2: government-procurement award notices
Real transaction prices, who won, and the list of what was procured. Used to fix “the unit price” and “who is making the money.”
Layer 3: tender documents and contract clauses
Bid-evaluation methods, warranty length, clauses after warranty, and ceiling unit prices for operations and maintenance. Used to fix “how the rules are written.”
Layer 4: public reporting after completion, and the industry's own account
Reporters' return visits, notices on local government websites, and the industry press summing up “pseudo-scrapping.” Used to fix “what actually happened.”
The credibility of these four layers declines in that order, but they can cross-check each other. Take “equipment degrades” as the example: a reporter's return visit gives the scene, the procurement contract explains why the equipment degrades, and the operations-and-maintenance unit price explains why nobody takes it over. Only when the three kinds of evidence corroborate each other does the conclusion stand.
03Evidence 1: the arithmetic of scale — this pool cannot fund R&D
Get the denominator out first. If the denominator is wrong, everything said after it is empty talk.
Weigh it once, from the bottom up
[Estimate] The following is our calculation. Every step can be challenged and replaced:
| Variable | Value | Basis |
|---|---|---|
| Stock of urban public toilets nationwide | 20.1 ten thousand | End of 2025, housing and urban-rural development authorities' basis; separately, 18.3 ten thousand directly administered public toilets |
| Annual new-build + renovation rate | 3%—5% | Directly administered public toilets grow 2.81% a year; policy-driven renovation is stacked on top; we take 3—5% |
| Toilets involved per year | 6,000—10,000 | 20.1 ten thousand × 3%—5% |
| Cost of the “smart” portion, per toilet | 1.5—10 ten thousand yuan | 2026 tender conditions: basic 1.5—3 ten thousand yuan, standard 5—10 ten thousand yuan, high-end 15—30 ten thousand yuan; weighted toward basic + standard, the median is about 3 ten thousand yuan |
| Annual smart market, municipal public toilets | 0.9—10 hundred million yuan | 6,000—10,000 toilets × 1.5—10 ten thousand yuan |
| Non-municipal settings (hubs / scenic areas / commercial / hospitals) | ×1.2—1.5 | The count is not in the urban public-toilet statistics, but the budget per toilet is higher; a conservative scale-up |
| Annual addressable size (midpoint of the valuation) | 3—10 hundred million yuan | The midpoint range. This is our estimate, not any institution's figure |
This figure can also be cross-checked against another, independent path, and the result is tighter than we first estimated. A newly built public toilet costs 25—100 ten thousand yuan in total. The “smart” portion is 5%—15% (early material commonly wrote 15%—25%; that share is high, and it should be counted as 5%—15%), which is 1.25—15 ten thousand yuan per toilet. Multiplied by 6,000—10,000 toilets, the market is about 0.75—15 hundred million yuan. The lower bound of 1.25 ten thousand yuan is close to 1.5 ten thousand yuan, and the upper bound of 15 ten thousand yuan is the same order of magnitude as 10 ten thousand yuan. The medians largely coincide. The estimate of 3—10 hundred million yuan therefore has a basis.
Along the way, a conclusion that is not often stated: "smart" is only 5%—15% of the cost of the whole toilet. From start to finish it was never the main course. That means two things. First, anyone who talks about it as an "industry" is talking about the place of a side dish. Second, precisely because it is only 5%—15%, it is the first thing the client cuts when the budget is cut, and cutting it hurts the least (the price curve in Section 06 is, in essence, this small piece being squeezed again and again).
Then the denominator inside the denominator
How many people are fishing in this pool?
- [Fact] Public industry material: nearly a hundred enterprises registered in China are involved in the smart public-toilet business, and the prevailing way they ship is “buy off-the-shelf generic hardware + adapt open-source software.”
- [Fact] The same material gives the concentration: CR5 is under 28%. The market is plainly fragmented.
- Besides registered enterprises, there is a large number of players who do not register in this category: sanitation service companies, construction companies, prefabricated-toilet factories, operators' city branches, and local system integrators. They are the ones who actually win the bids (see Section 10).
Run the numbers:
The middle card is worth a longer look. A leader's annual revenue does not exceed 2,500 ten thousand yuan — this is not "our estimate." It is the state of this category: nobody in this industry has ever gotten past 3,000 ten thousand yuan. Turn it around and use it to check the pool. The leader is at 2,500 ten thousand yuan. The fifth, estimated at 800—1,500 ten thousand yuan, puts the top five together at about 0.7—0.9 hundred million yuan. Working backward from a CR5 under 28%, the pool is at least 2.5—3 hundred million yuan. That agrees with the bottom-up 3—10 hundred million yuan, and it says the true value is more likely to fall in the lower half of the range.
[Inference] Now do the subtraction. A hardware R&D team of 15 people, at a full cost of 20—30 ten thousand yuan per person per year (wages, social insurance, office, equipment, travel), is 300—450 ten thousand yuan a year. Add tooling, type testing and certification, and a trial run, and a platform from project start to stable shipment takes 1,200—1,800 ten thousand yuan over three years.
On the revenue side the ceiling is only 2,500 ten thousand yuan. At a 40% gross margin that is 1,000 ten thousand yuan. Those 1,000 ten thousand yuan have to pay three things first:
| What gross profit must pay first | Share of revenue | Amount (ten thousand yuan / year) |
|---|---|---|
| Sales — project-based: bid documents, travel, relationship maintenance | 8%—12% | 200—300 |
| Delivery and installation — project managers, construction, commissioning, acceptance | 10%—15% | 250—375 |
| Management and finance — rent, administration, cost of capital | 8%—10% | 200—250 |
| The three together | 26%—37% | 650—925 |
| What is left for R&D | 3%—14% | 75—350 |
A 15-person team costs 300—450 ten thousand yuan a year. The books barely break even only when sales, delivery, and management are all pressed to the bottom of their ranges and R&D is also at the minimum configuration. If any one of them approaches its upper bound, a gap appears. That is before the second and third years. Cumulative gross profit over three years is 3,000 ten thousand yuan. After deducting 1,950—2,775 ten thousand yuan of expenses, 225—1,050 ten thousand yuan is left. Three years of R&D takes 1,200—1,800 ten thousand yuan. The gap is 150—1,575 ten thousand yuan.
This is also why the industry commonly uses the "buy off-the-shelf generic hardware + adapt open-source software" model. It is not laziness or speculation. It is the choice that the arithmetic can support at the present scale. A leader usually keeps only 3—5 people for integration and adaptation, and buys all the hardware outside. It is not that they do not want to make a product. This account does not allow it.
This is what we mean by “it never grew up”: it is not that practitioners are unwilling to invest in R&D. It is that at the existing revenue scale, a rational operator can hardly recover an R&D investment.
It can prove: “buy off-the-shelf generic hardware + adapt open-source software” is not laziness or speculation. It is the optimum at this scale. So the hope that this industry will grow a technical capability of its own does not hold mathematically.
It cannot prove: that no vendor has R&D capability. Some vendors do full-stack in-house development, but they are either supported by another main business or they carry an internal supply task for a group. What scale constrains is the industry average, not every single company.
04Evidence 2: even “who is No. 1” has to be bought
How an industry describes its own competitive landscape exposes how it actually competes.
While researching, we searched “smart public toilet competitive landscape.” The first batch of results was the same article — the same title, the same structure, the same paragraphs, even the same punctuation — with only the publishing site changed:
| Publishing site | Title | Conclusion |
|---|---|---|
| Xianning News | Report refresh: 2026 development prospects and competitive landscape of smart public toilet systems | A certain company is “far ahead in overall strength” |
| Hengyang News | Report refresh: 2026 development prospects and competitive landscape of smart public toilet systems | The same company “firmly holds first place in the industry” |
| Huanggang News | 2026 smart toilet recommendations: which one is most trustworthy | The same company “is undoubtedly the TOP1 representative manufacturer” |
| Jining News | 2026 survey report on the TOP1 leading manufacturer of smart public toilet solutions | The same company “has opened a gap with its peers” |
Source: public search results, September—October 2026. The four pieces are highly isomorphic. All of them hand out a tier ranking in the name of “industry survey data,” and the first tier has only one company.
This is not an industry report. This is distribution. Pay for the space, lay one press release across several local news sites, and make it look like a third-party conclusion.
We are not saying that company's product is bad — we have not tested it, and we have no basis to judge. What we are pointing at is something else:
Compare an industry that actually has market share. In switches, whether Centec is No. 1 in domestic switch chips can be settled by reading its annual report and its customer list. There is no need to buy an advertorial. In this industry, the only thing a public channel can turn up is the press release.
What makes the point even more clearly is that the figures inside this same batch of “reports” contradict themselves. In one article about the Chinese market, the same paragraph writes both “the global smart public toilet system market is expected to be USD 1.70 hundred million in 2026” and “the Chinese intelligent public toilet market will exceed 120 hundred million yuan in 2025.” China would be ten times the world. The person who wrote it did not notice, and the person who published it did not notice, because nobody actually reads it.
It can prove: this industry has no credible third-party evaluation system. A buyer cannot tell a good supplier from a bad one from public information — this point is decisive. It is one direct cause of the price war. If the buyer cannot tell them apart, the only thing left to compare is price.
It cannot prove: a flood of advertorials and whether a product is good or bad are two different things. It cannot be used to judge that these vendors have no real capability.
05Situation 3: the industry standard is a checklist, not indicators
The question this section discusses is the one this report weighs most heavily. It explains “why the industry ends up competing on price.”
First, the standards this industry currently has:
| Time | Standard / document | Level | Core form |
|---|---|---|---|
| 2019 | Shanghai Guidelines for Smart Public Toilet Construction (Trial) | A local guideline, the first in the country | 61 facility configurations, in three tiers: basic, recommended, and advanced |
| 2022 | Technical Specification for Intelligent Systems of Urban Public Toilets | A Chongqing local standard, the first case in the country | Specifies system composition and structure, and the functional composition of the public service platform and the operations management platform |
| 2023 | Technical Specification for Smart Public Toilet Management Platforms | A group standard (draft) | Sets requirements for platform hardware, data, functions, and security |
| — | A mandatory national standard | Not found | — |
Sources: the 2019 release notice of the Shanghai Landscaping and City Appearance Administrative Bureau; the May 2022 standards press conference of the Chongqing Municipal Urban Administration Bureau; the group-standard information platform of the China National Institute of Standardization, October 2023.
Look at the form of the Shanghai guidelines: 61 facility configurations, classified in three tiers, “basic / recommended / advanced.” This is closer to an order sheet — however much budget there is, that many items are chosen. The Chongqing local standard is more detailed. It states which subsystems the system is composed of, and which functional modules each platform must have.
These standards all have value. They dealt with the disorder of “everyone builds their own, and none of them interoperate.” But they share one feature: what they specify is “what should be present,” not “what result must be achieved.”
Acceptance then becomes this: count the items against the list, tick a box if it is there, and pass when the set is complete. As for whether an item works after it is installed, whether it is accurate, and whether it is still online three months later — the list has no column for that, so the acceptance form has no column for that either.
A results standard → acceptance = measure indicators → the supplier's optimal strategy = make the indicators real and keep cost under control
These are two entirely different rules of competition. This industry chose the first set.
This inference has a strong counter-proof: wherever there is a quantifiable indicator, product competition has actually happened.
[Fact] Tenders for transport-hub projects explicitly require “stall-identification accuracy ≥99.5%.” Expressway service areas require “automatic denser cleaning at peak, and automatic odor purification.” These requirements can be measured, so the supplier has to put resources into algorithms and sensors. By contrast, a pure municipal procurement usually requires only “configure one stall-guidance system” and “configure one environmental-monitoring system.” Since the result cannot be measured, the supplier does not have to spend extra on it.
It can prove: “competing on price” is not a moral problem of practitioners. It is the necessary result of the form of the standard. A checklist standard compresses the dimension of competition into two numbers, “item count” and “total price.”
It cannot prove: that the people who wrote the standards were wrong. Early in an industry, settling “what is present” first is necessary. The problem is that ten years on, the standards are still stuck at the configuration layer and have not moved to the results layer.
06Situation 4: market quotes fell by two-thirds in two years; cost did not follow
This is the only set of figures in the whole paper that comes from us, and it is the project that pushed us out of the turnkey layer.
The evidence in the previous sections all comes from public material. This section uses one of our own projects as the sample, because a public award notice lists only the final transaction price, and does not state what a comparable project cost three years earlier; and that comparison is what decides whether this business can be done.
| Project | Time | Scale | Budget / transaction price of the smart portion |
|---|---|---|---|
| Smart restroom at an expressway service area (our side participated) | 2023 | About 150 stalls on both sides combined, including the third restroom | On the order of 30 ten thousand yuan |
| Service areas of the same scale (from inquiries in multiple places) | 2025 | Same as above, 150 stalls on both sides | About 10 ten thousand yuan |
Source: this company's project records. A single case, not a statistical sample; but the direction agrees with the downward public award prices we found.
Over two years, with the same scale and the same list of items, the price fell by about two-thirds, equivalent to about −42% a year. This is not one supplier's quoting tactic. Over the past two years, when we inquired at the 2023 configuration, the quotes we got were all around 10 ten thousand yuan.
A point of basis has to be stated first: 150 stalls and 10 ten thousand yuan works out to 667 yuan per stall. At the 2023 configuration, with not one item removed, the cost is about 18.6 ten thousand yuan, 1,240 yuan per stall. The two differ by about 46%. So the curve below is not “the same thing got cheaper.” It is price first falling through the cost line, and the configuration then starting to shrink. The second half of this section measures those two things separately.
Put the two lines together and what you see is not "fierce competition." It is a more specific phenomenon: the quote line crossed the cost line in the first half of 2024, and it never came back. After that, every bid is a bid below cost. The only difference is who loses more, and who loses for longer.
The 20 ten thousand yuan that was cut: 11 ten thousand is profit to zero, 8 ten thousand is a cost gap
If the price cut came from higher efficiency, cost should have fallen in step. It did not. Over these two years, of the items that make up cost, four rose, and only one fell:
| Cost item | 2023 → 2025 | Reason |
|---|---|---|
| Sensing devices | Up | Infrared → laser TOF → millimeter-wave; cost per point rises with each generation (Correction 2 in Section 14) |
| Labor and installation | Up | On-site commissioning person-days, travel, ceiling work, and work at height |
| Screens and bought-in parts | Up | Sizes keep getting larger, and panel prices fluctuate |
| Warranty and spare parts | Up | The warranty was stretched from 1—2 years to 3 years |
| Main controller and communications module | Down | The only item that truly fell, and its effect on the whole package is under 5% |
The difference of 20 ten thousand yuan splits roughly in two: one part goes to zero, and one part becomes a cost gap.
First: of that 30 ten thousand yuan in 2023, the 11 ten thousand yuan outside the hardware all went to zero. Working backward from the delivery cost of 150 stalls (for comparison, restated uniformly at 2025 purchase prices), hardware and installation on that job were about 18.6 ten thousand yuan (the next subsection has the breakdown). The remaining 11.4 ten thousand yuan was the following:
| Inside the 30 ten thousand yuan of 2023, the part outside the hardware | Amount (est.) | What is left inside the 10 ten thousand yuan of 2025 |
|---|---|---|
| Platform deployment + three years of operations-and-maintenance service | 2—3 ten thousand yuan | Gone. Handover of the keys is the end (Section 07) |
| Custom development for the site | 1.5—2.5 ten thousand yuan | Gone. A template is applied; if the interface does not match, it is patched on site for two days |
| Redundancy and margin (backup, spare points, dual links) | 0.8—1.2 ten thousand yuan | Gone. A single point: if it breaks, it breaks |
| On-site commissioning and training (about 2 weeks) | 1.2—1.8 ten thousand yuan | Gone. Leave once it is installed, in 2 days |
| Integration and channel profit | 3.5—5.5 ten thousand yuan | Squeezed below 5%, even to zero |
| Total | 9—14 ten thousand yuan, median 11.4 ten thousand yuan | — |
Of these five items, what remains inside the 10 ten thousand yuan of 2025 is zero. They were not “squeezed down.” The whole item is gone.
Second: even if all five of these costs are cut, the quote is still not enough. The 2025 quote of 10 ten thousand yuan is still below the “spec not lowered” delivery cost of 18.6 ten thousand yuan. The difference is still 8.6 ten thousand yuan. There is no service left to save. The only place left to cut is the configuration itself.
Only the two together make that 20 ten thousand yuan: about 11.4 ten thousand yuan is “profit to zero,” and about 8.6 ten thousand yuan is “the cost gap.” The first is a commercial act. The second is a physical constraint.
And this can go on because the checklist has not changed. The checklist only requires “configure one stall-guidance system.” It does not say whether that set includes operations and maintenance, customization, or redundancy (Section 05). As long as the checklist does not change, room to cut the price can always be squeezed out of the parts the checklist does not explicitly require.
An account in which nothing is cut
This is where our judgment at the time came from. Suppose cost is pressed to the bottom: no middleman, dealing with the client directly; installation handed to a local crew, settled by person-day, with no crew of our own; supply that does not lower any specification, and construction done to the specification. Back-calculated against 150 stalls (both sides combined, including the third restroom) and a quote of 10 ten thousand yuan:
| Cost item | Basis | Amount (ten thousand yuan) |
|---|---|---|
| Stall-status collection | 150 stalls (door magnet / infrared + indicator light outside the door + local wiring), about 210 yuan per stall | 3.2 |
| Environmental monitoring | Ammonia, hydrogen sulfide, temperature and humidity; 8 sets in total across both sides, men's, women's, and the third restroom | 1.0 |
| Footfall counting | 4 entrances in total on both sides, binocular counting | 0.9 |
| Smart water and electricity meters | 2 sets | 0.3 |
| Aggregation gateways | 8 units (4 per side, networked by zone) | 0.7 |
| Guidance screens and displays | 2 entrance large screens (one on each side) + 6 zone screens | 3.5 |
| Cabling and auxiliary materials | Cable, tray, openings, and conduit for 150 points | 2.6 |
| Installation and commissioning | 4 people × 12 days, including travel (150 points; the two sides cannot start at the same time) | 2.6 |
| Three-year warranty accrual | Spare parts + response, per the contract terms | 2.2 |
| Tax | Goods and services mixed, about 9% combined | 1.1 |
| Project and acceptance | Documents, test reports, trips for acceptance | 0.5 |
| Subtotal | 18.6 |
Note 1: this table does not include a "software platform and integration." On a service-area project of this kind, the guidance screen and local management come with the equipment and do not connect to an upper platform, so this item is counted as zero.
Note 2: sensing devices are priced at the bought-in market price. If the whole sensing chain is replaced by the in-house unit in Section 15 (BOM about 87—134 yuan per stall), the sensing portion can fall from 6.1 ten thousand yuan to 1.3—2.0 ten thousand yuan, and total cost from 18.6 ten thousand yuan to about 14 ten thousand yuan — still far above 10 ten thousand yuan. Productization can turn gross margin from negative to positive, but it does not change this arithmetic.
Not yet included: R&D amortization; bidding cost (bid document + samples + travel, 0.5—1 ten thousand yuan per bid, paid even if the bid fails); interest on funds advanced (a 3—6 month payment term); and the back-and-forth time of acceptance.
Hold the specification, do the construction properly, and cut out the middleman. Even if all three are done at once, that only makes the loss clear. It does not make the loss go away.
The 8.6 ten thousand yuan that has to be made up is not in “services.” It is in equipment and construction cost. The five services have already been cut entirely. There is nowhere left to save. To make up this 8.6 ten thousand yuan, the only place left to cut is the configuration in the table below. After the schemes in the table save 10.5 ten thousand yuan in total, a quote of 10 ten thousand yuan has some gross margin.
| Which item is cut | Saved | What happens three years later |
|---|---|---|
| Cut the screens (entrance large screens + zone screens all removed; only a local small screen left) | 3.5 ten thousand yuan | Caught on the spot as “one item short”; acceptance fails |
| Cut sensing points (only 60 of 150 stalls are done) | 1.9 ten thousand yuan | Incomplete data; the guidance screen shows “unknown” over a large area |
| Cut installation and commissioning (12 days pressed to 4 days) | 1.7 ten thousand yuan | It can be installed and cannot be commissioned; failures break out together in the first three months |
| Cut the three-year warranty (down to 1 year) | 1.5 ten thousand yuan | It stops the moment warranty ends, which lands exactly on the “online rate under 30%” in Section 09 |
| Cut environmental monitoring (ammonia, hydrogen sulfide, temperature and humidity) | 1.0 ten thousand yuan | No data on odor; nothing to show when there is a complaint |
| Cut footfall counting | 0.9 ten thousand yuan | The guidance screen reports only “occupied or not,” not “how long the wait will be” |
| Total | 10.5 ten thousand yuan | Cost falls to about 8.1 ten thousand yuan, and only then does a quote of 10 ten thousand yuan have gross margin |
Look at this account: every configuration item that is cut corresponds, three years later, to a specific problem. This is not a vague “the quality is a bit worse.” The equipment will fail at a specific point in the future. A low price is not “value for money.” It only moves cost off the quotation and onto the timeline — the party who pays is still the client, only it is the client three years later.
One more point ties the calculation in this section to the observation in the previous one: the screens, environmental monitoring, and footfall counting cut in the table above are exactly the items Guangzhou Metro cancelled on the 2026 extension (Section 08). This is not two organizations happening to think of the same thing. The same cost account produced the same result.
The other way around: supplying direct from the manufacturer is a disadvantage in this market
This is the most unexpected point, and the one most worth our attention.
It is usually said that a middleman adds 15%—25%. Remove the middleman, and the manufacturer selling direct gains a price advantage. Put the two speeds of change together, and calculate them on the scale of the 2023 project of 30 ten thousand yuan:
All of the middleman's profit that is saved is only enough to offset five to nine months of the price decline. That is, the price advantage gained by selling direct does not last a year before the market itself wipes it out. And you permanently lose the channel, and you lose pricing flexibility on the next bid.
More important, what the middleman provides is not only a channel. It also includes advancing funds, coordinating acceptance, and the ability to decide whether to lower the specification and to bear the corresponding responsibility. Once the manufacturer signs directly, all of this falls on the manufacturer. If the specification is lowered in a contract the manufacturer signed itself, the reputation that is damaged is its own product's, not someone else's.
It can prove: the speed at which quotes fall (about −42% a year) is far faster than the speed at which cost falls (close to zero, and four items are still rising). So the path of "optimize cost first, then join the competition" does not work mathematically — the limit of cost optimization is a single-digit percentage, while the price fell 67% in two years. This also explains why the account in Section 13 is always negative: technology is not worthless. The space between quote and cost has already been eaten up by this curve, and there is nowhere for any incremental investment to be recovered.
It cannot prove: that every region has already fallen to this price. Places with healthier public finances, and hub and service-area projects that the owner operates itself, are still in the 20—30 ten thousand yuan range (Section 11). It also cannot be said that a lower price is entirely a bad thing — building a few more toilets on the same budget has a rationale for the client too. This curve says only this: at the 10 ten thousand yuan price, a proper supply can hardly both hold the specification and not lose money.
07Situation 5: after project acceptance, there is no guardian
The operations-and-maintenance budget for public toilets is not small, but the budget lines contain no item called “system.”
First, how much operations-and-maintenance budget a public toilet actually has in a year
This is the most persuasive set of figures in the public material. Below are the ceiling unit prices in tenders for public-toilet cleaning and facility-maintenance services in various places:
| Place | Scope of service | Unit price (yuan per toilet per year) | Year |
|---|---|---|---|
| Beijing Yizhuang Development Zone | Public-toilet cleaning (13 toilets at this unit price) | 77,826 | 2026 |
| Shuofang Subdistrict, Xinwu District, Wuxi | Class 1 public-toilet cleaning | 103,700 | 2025 |
| Shuofang Subdistrict, Xinwu District, Wuxi | Class 2 public-toilet cleaning | 84,500 | 2025 |
| Shuofang Subdistrict, Xinwu District, Wuxi | Class 3 public-toilet cleaning | 65,500 | 2025 |
| Youxian District, Mianyang, Sichuan | Public-toilet management and maintenance (including water and electricity, consumables, and repair materials) | 77,555 | 2025 |
| Tianluhu, Guangzhou | Public-toilet cleaning (dedicated patrol, ≥12 hours) | 148,831 | 2026 |
Sources: tender notices and contract texts published on the China Government Procurement Network and the government-procurement platforms of Jiangsu, Sichuan, and Guangdong. The table shows ceiling unit prices. Actual transaction prices are usually a little lower.
Put these figures next to the cost of the “smart” portion, and the gap between them is obvious:
The operations-and-maintenance money is 5—10 times the hardware, and it is there every year. These are figures that would tempt anyone who makes equipment. The problem is this — the budget line for this money is called “public-toilet cleaning services” and “routine facility repair.” It is paid to sanitation service companies, and the scope of service is written as “daily cleaning, septic-tank emptying, sanitary-ware consumables, and routine facility repair.”
Inside it, there is not one item called “smart-system operations and maintenance,” and there is no corresponding unit-price standard.
Then the out-of-warranty clauses in the contracts
There is a warranty, and it is not short:
| Project | Warranty | The original wording after warranty (excerpt) |
|---|---|---|
| Yuelu District, Changsha (two prefabricated smart environmental public toilets) | 3 years from acceptance | “After the warranty expires, whether or not the client separately chooses the contractor for maintenance, the contractor shall promptly provide the required spare parts at a preferential price” |
| Chongzhou, Sichuan (zero-discharge ecological public toilet) | 2 years from acceptance | “Replacement or repair outside the warranty period is charged at cost” |
| Yulin, Shaanxi (zero-discharge smart public toilet) | 1 year warranty + 2 years repair period | “After the repair period… only the cost of repairing or replacing the damaged parts is charged” |
Sources: a contract notice on the Changsha government procurement website, a procurement-requirements document on the Sichuan government procurement website, and tender documents on the Shaanxi government procurement website.
These clauses have one thing in common: what is promised after warranty is “providing spare parts” or “charging at cost,” not “continuing operations and maintenance.” That is, the contract writes the end of responsibility as the day the warranty expires. This is not a question of whether the vendor is cunning. The contract terms and the tender requirements are written this way.
Then the account that does not add up
[Fact] The quoting basis the industry states in public: after warranty, the annual maintenance fee for ordinary equipment is about 5%—8% of the equipment's total price; the annual operations-and-maintenance fee for an IoT platform is usually between 1 and 5 ten thousand yuan.
Put these numbers together: a basic system is 1.5 ten thousand yuan, and the platform's annual fee is 1—5 ten thousand yuan. One year of platform operations and maintenance costs more than the entire hardware set.
[Inference] This explains why the renewal rate is extremely low. For a set of equipment that has already passed acceptance and has a book value of only 1.5 ten thousand yuan, the client would have to add 1—5 ten thousand yuan a year as a “platform service fee.” That spending has no budget line, no precedent, and no unit-price standard, and it has to go through government procurement again. The great majority of units choose not to approve the money, and the system gradually stops — acceptance has already passed, and the appraisal does not look at this item.
It can prove: “after-sales do not matter” is not an attitude problem. It is a problem of the payment structure. The operations-and-maintenance budget exists, but it is listed under another line, handed to another kind of company, and it buys another kind of service. The equipment vendor cannot get this money, and so has neither the corresponding duty to maintain nor the corresponding capacity.
It cannot prove: that no project has operations and maintenance. Indore's project of 350 public toilets wrote into the tender documents that “the winning bidder shall manage and maintain the IoT facilities for 60 months.” That shows the practice is feasible. It is just not yet common.
08Situation 6: the same client, three years later, and the project requirements are down to two items
Guangzhou Metro made two changes: the smart-restroom configuration went from nine items to two, and operations and maintenance was transferred from the manufacturer to the M&E company. And the transfer of operations and maintenance is the reason the configuration shrank.
The previous two sections were about “price” and “the operations-and-maintenance budget.” This section looks at a specific project: the same city, the same kind of station, the same owner, and over three years the procurement requirements changed, and the change is more thorough than the change in price.
First, how the list changed
[Fact] The smart-restroom configuration on Guangzhou Metro's existing lines three years ago, set against the configuration on the 2026 extension:
| Function | Three years ago (existing lines) | 2026 (extension) | Which kind it belongs to |
|---|---|---|---|
| Occupancy sensing (occupied / vacant) | Present | Present | A status source: cleaners and security use it directly |
| Smoking detection | — | Present (added) | A compliance item: smoking control and fire inspections appraise it |
| Lighting linkage | Present | Absent | Reassigned — the lighting trade does this itself |
| Automatic flushing | Present | Absent | Reassigned — sanitary ware and plumbing |
| Air-quality detection | Present | Absent | A data type: who looks at it, and who acts on it? |
| Temperature and humidity monitoring | Present | Absent | A data type |
| Hydrogen sulfide monitoring | Present | Absent | A data type (the item that should have had the most operating value) |
| Footfall counting | Present | Absent | A data type |
| Large screen (guidance / display) | Present | Absent | A display type: the concourse already has a wayfinding sign system |
| Feedback | Present | Absent | An interactive type: someone has to close the complaint loop |
Source: this company's participation in the projects and on-site comparison records (existing lines in 2023, the extension in 2026). The list follows the owner's requirements document. No inference is made about specific brands or models.
Dark green = kept; light yellow = added; gray = moved out of the smart package (the function remains, under another trade); red = cut.
Nine items became two. This is not “the standard dropped a little.” A system was cut down to a switch.
The pattern: the boundary of the configuration is the boundary of the post
Rearrange this table by “whether there is a person behind it,” and the pattern is very clean. There is no exception:
The two items that remain each have a clear post that uses them. Occupancy sensing can show “occupied / vacant,” and cleaners and security use it to judge which stalls are in use and when they need cleaning. Smoking detection can find “someone is smoking” and hand it to smoking-control patrols and fire inspections — this work has a clear external appraisal, and failing to check it has consequences.
The two items that were “reassigned” also have a clear post that owns them. Lighting is the lighting trade's job. Flushing belongs to plumbing and sanitary ware. In our view these two are “smart” functions, but in the owner's organization they belong somewhere else. They were moved out of the smart package. The function did not shrink. The responsible person and the budget line changed. Functions that were reassigned did not disappear. What actually disappeared are the ones that were cut.
The six configurations that were cut have no clear responsible post. The five kinds of data — air quality, temperature and humidity, hydrogen sulfide, footfall, and feedback — plus a large screen, are useful only when someone uses the data to schedule work, deal with problems, and keep improving. The owner's staffing table has no such post, and the M&E company's contract does not include this kind of work. Data that no post is responsible for cannot do any work.
The question is: was this function cut because it is useless, or because there is no one who can catch it?
This is the core judgment of this section: the boundary of the configuration = the boundary of the post. Whether a function stays on the list does not depend on whether the technology is advanced, or whether the case study looks good. It depends on whether there is a specific person behind it, and whether that person's appraisal includes this item.
The second change: operations and maintenance passed from the manufacturer to the M&E company
[Fact] Three years ago, the owner would from time to time ask the manufacturer to help maintain the equipment and the system — the manufacturer sent people, and took part for free or nearly for free. In 2026, this was basically handed to the M&E company, and the manufacturer is rarely asked to take part. The result is that maintenance and repair of the old system have basically stalled.
This change is more fatal than cutting configuration items, because it explains why the configuration was cut. First look at what the party taking over can actually catch:
| The capability circle of the M&E company (comprehensive equipment and facility maintenance) | Can they catch it? | Why |
|---|---|---|
| Power distribution, lighting, ventilation, plumbing, elevators, fire protection | They can catch it | There is a trade, spare parts, work orders, and a pricing standard (per unit / per piece / per visit) |
| A sensor fails, a screen goes dark, a gateway loses power | They can catch it | In essence it is “replace the part,” the same structure as repairing a lamp or a pump |
| The platform goes offline, data stops refreshing, an interface breaks | They cannot catch it | There is no such trade, and no pricing line for it — it cannot be written into a quote |
| Algorithm false alarms, wrong point logic, protocol integration | They cannot catch it | It needs the original manufacturer's knowledge, and it is not in the category of “equipment and facilities” |
The result is: when the hardware breaks, someone is in charge. When the system breaks, no one is. What the site calls “maintenance and repair have basically stalled” does not mean nobody is at work. It means the existing maintenance staff can handle only part of the problems.
Section 07's conclusion also needs a correction here. More precisely, there is someone who takes over, but they can handle only the half that can be priced per piece. “There is no one to take over” is a judgment. “They can catch only half” is a fact that can be carried into the work, and it also says how the product should be designed.
Join the two changes: why it gets cut
When the owner reviews this three years later, the conclusion will not be “this system needs stronger operations-and-maintenance support.” It is more likely to be “we cannot maintain this thing; buy less of it next round.”
This is a very rational conclusion. It does not need an argument about whether the technology has value. It needs only one fact: the six items cut in the previous round produced not a single action in three years.
What you cut is not a function. It is a function you cannot prove you can maintain. The list does not get longer because the technology got better. It gets longer only because someone can catch it.
This also explains a phenomenon that price alone cannot explain: some places are not short of money, and they still delete configuration items. The problem is not the budget. It is that they bought it once and nobody maintained it. The price curve in Section 06 reflects the same point: the supply side is cutting price, the demand side is cutting items, and the two are two sides of the same thing.
One more point, the one that matters most to us
Three years ago the manufacturer could take part in operations and maintenance, for free and informally, on the basis of “keep the customer, and wait for the next batch of projects.” This is the only channel through which a company of this kind obtains field knowledge.
In 2026 that channel closed. After it was handed to the M&E company, what the manufacturer lost was not operations-and-maintenance revenue (there was none to begin with). It was three things: knowing what actually failed on site, knowing what the customer will change next round, and knowing what state its own product is in during the third year.
Section 13 says technology has become a liability in this market. This point is the other side of that: even the field knowledge required to make the product right was cut off with it. Product iteration without field knowledge can only be guesswork.
It can prove: the contraction of the configuration is not random, and it is not simply pressing the price — it contracts along the line of “whether a post can catch it,” and the contraction is very thorough (nine items to two). At the same time it proves that the direction in which operations-and-maintenance responsibility moves is concentration onto general M&E contractors, and the capability circle of that kind of contractor does not include the platform and the data, so the smart portion of the old system necessarily stalls.
It cannot prove: that every rail-transit or B-end customer will do this. This is a comparison of a single owner, a single city, and two points in time; the sample is 1. It also cannot be used to judge that the owner “does not take it seriously” — the opposite: keeping smoking detection shows they take very seriously the items that will be appraised. That point in fact supports this report's conclusion: it is not that they do not take technology seriously. They take more seriously the technology that someone can catch.
09Situation 7: the equipment has not broken, but it degrades and loses its function
In this market, the way users “vote with their feet” is not to complain. It is to take the equipment out.
All of the material in this section comes from public reporting, not from our inference. Three cases, and the nature of them is exactly the same.
Case 1: Laoshan, Qingdao — three standalone smart public toilets
Put into use before October 2022. In December 2022, citizens reported that the smart public toilet on Pingshan Road was shut tight and could not be used, because the access-control system had failed.
In June 2024, a reporter went back to the three public toilets (Pingshan Road, Hai'an Road, and Haijiang Road). The scene was this:
- The smart access-control system had been removed
- The smart occupancy light still showed green when the stall was occupied (green means vacant)
- The automatic-flush sensors on washbasins and squat toilets had failed
- The time, temperature, and other information on the environmental monitoring screen were all wrong
- The automatic flush units on washbasins and squat toilets had been replaced by conventional manual units
Source: Qingdao Daily, 14 June 2024, page 05, the series “Smart convenience equipment trapped as mere decoration.”
Pay particular attention to the last item. It is not that the equipment broke and nobody repaired it. The maintenance unit removed the smart parts and put manual parts back. This is the lowest-cost way to “repair”: a sensor faucet is 300 yuan, a manual faucet is 30 yuan; a sensor faucet breaks once every three months, a manual faucet does not break for three years. From the maintenance party's point of view, this is a completely rational choice.
The same report also says the park management stated that it is responsible only for landscaping and sanitation cleaning, and that maintenance of the sports facilities is the maintenance contractor's job. When the reporter called the maintenance contractor, the phone was never answered.
Case 2: Shengsi, Zhejiang — more than ten smart public toilets
- The guidance screen at the Yunlong Road public toilet was black
- Data at the Shahe Road public toilets and others had not been updated for a long time, and “today's water consumption” was always zero
- The cause: partly an unstable network, and the electronic water meters were also still being procured
- Humidity and footfall on the guidance screen were disconnected from what citizens care about, toilet-paper supply and cleanliness; citizens all walked straight in to check for a free stall, and the screen might as well not have been there
Source: republished on the Shengsi County People's Government website, “Island City Focus: Smart convenience equipment trapped as mere decoration” (2025).
“The electronic water meters were also still being procured” — this is the sharpest sentence in the whole set of materials. It shows: at acceptance, the data was fake; and acceptance passed. “Today's water consumption” showing 0 is not a fault. A meter was never connected.
Case 3: the online rate of the entire smart-sanitation industry
The industry's own account (not an outside criticism): 2020—2023 was the period of concentrated smart-sanitation construction nationwide. Projects “were generally hardware procurement and one-off project delivery, and lacked a full-life-cycle operations-and-maintenance plan.” The consequence:
- In some cities, smart sanitation terminals commissioned in 2021—2023 had an equipment online rate under 30% two or three years after going live
- A large amount of equipment is physically intact and far from its physical end of life, yet has completely lost its smart capability because of “lagging algorithm updates, the cloud platform going offline, the original manufacturer's operations and maintenance ending, the communications link breaking, and data interfaces being closed”
- Inside the industry this is called “pseudo-scrapping” — the hardware is not broken; the smart function is dead
- One cause: early projects mostly used the vendor's private closed protocols. Equipment software and hardware were deeply bound, and a third party could not connect or upgrade
Source: a public article in the industry press, “Under misaligned technology iteration, how to break the ‘pseudo-scrapping’ of smart sanitation equipment?” (2026).
[Inference] An online rate under 30% means that out of every 10 projects and devices, 7 fail within two years. This number is more honest than any customer-satisfaction survey. It is also the result of the account we ran in Section 03: no operations-and-maintenance line → it stops when warranty ends → the platform goes offline → the device becomes a brick.
It can prove: “actual results do not matter” is not an evaluation. It is an observable fact, and the direction of the degradation is highly consistent — from smart back to manual, from online back to offline, from a system back to a decoration.
It cannot prove: that the equipment itself is of poor quality. The problems in the cases are mostly about operations and maintenance, and about responsibility, not hardware failure. For us, that means raising hardware reliability alone cannot solve the problem.
10Situation 8: who is taking orders from the user side
The list of winning bidders is more accurate than any promotional material.
We sorted the award results we found by the type of winning bidder:
| Project | Year | Award amount | Winning bidder | The winning bidder's main business |
|---|---|---|---|---|
| Shaoxing urban smart public toilets, phase I | 2021 | 289.0 ten thousand yuan | China Mobile Communications Group Zhejiang Co., Ltd. Shaoxing Branch | Telecom operator |
| Smart public-toilet procurement, Guanyun County, Lianyungang | 2021 | 81.6 ten thousand yuan | Zhongdian Hongxin Information Technology | A China Telecom-system integrator (of which 1 cloud-platform set is 7.17 ten thousand yuan) |
| Zero-discharge smart public toilet, Yulin Sci-Tech Innovation City | 2022 | 368.5 ten thousand yuan | Zhongyunhui (Chengdu) IoT Technology | IoT / environmental equipment (73.7 ten thousand yuan per unit × 5 units) |
| Prefabricated modular smart public toilet, Baiyun District, Guiyang | 2023 | 119.4 ten thousand yuan | Guizhou Wanshengda Construction Engineering Co., Ltd. | A construction company |
| 5G smart public toilet, Binhai Avenue, Zhoushan | 2026 | 44.8 ten thousand yuan | Hangzhou Baixing Construction Technology | Construction technology / engineering |
| Smart-toilet purchase demonstration, Nagqu | 2026 | 1,184.4 ten thousand yuan | Zhangye Lanbiao Biotechnology | Biodegradation / ecological toilets |
Source: the original texts of award-result notices on local government-procurement websites and public-resource trading platforms.
On this list, not one winning bidder has “smart public-toilet systems” as its main business. Operators, China Telecom-system integrators, construction companies, environmental-equipment vendors, and biodegradation companies are all on the list. For them, the technology is only a supporting step inside the project, not the core competence.
This is not an accident. It is the same thing as the earlier evidence, seen from another side:
- Because the scale is small, a specialist vendor cannot grow large, and can only be a component supplier
- Because the standard is a checklist, anyone can assemble one against the list; no specialist capability is required
- Because acceptance looks at the item count, engineering companies and integrators can handle it completely
- Because what the client wants is “a building that can be used,” not “a system,” construction companies and prefabrication plants are naturally closer
The Zhoushan project makes the point more clearly. The three bid prices were:
[Fact] The lowest price, 33.6 ten thousand yuan, ranked third and did not win. The winning price, 44.8 ten thousand yuan, is 33% above the lowest and 32% below the highest.
This result is more worth thinking about than “lowest price wins.” It says two things. One: evaluation is not purely lowest-price-wins; there is also a technical score and a credit score. Two: on the same project, the three quotes differed by nearly a factor of two (33.6 ten thousand yuan to 65.6 ten thousand yuan) — this is not vendors giving a discount. The tender documents did not say clearly what the words “smart public toilet” mean. Each bidder understood something completely different, and quoted three different things.
Unclear requirements → quote dispersion near 100% → evaluation can only rely on subjective scores → the weight of relationships and qualifications rises. Where this chain points, in the end, is still technical competition being eliminated.
11Counter-evidence: where it has not rotted
Without this section, this report would be emotion. And emotion cannot guide a decision.
We also looked specifically for counterexamples: among smart restrooms, are there projects that were done well? There are, and more than one. What they have in common is clear:
Expressway service areas
After the renovation of the G65 Baomao Zhusha Service Area and the G56 Chenxi North Service Area, passenger satisfaction rose from 63% to 92%, and consumables and cleaning costs were saved by more than 50 ten thousand yuan a year.
Source: the vendor's published case. Not verified by a third party. Confidence: medium.
Transport hubs
Airport and high-speed-rail station tenders explicitly require stall-identification accuracy ≥99.5%, and large passenger flows, tidal passenger flows, and emergency support are written into the requirements.
Source: selection guides and tender requirements compiled from industry solution vendors.
Hospitals and commercial sites
The focus is fall detection, contactless sensing, linked disinfection, and system integration — each has a clear person responsible for operations, and consequences that can be felt.
Source: same as above.
These three kinds of setting differ from a municipal public toilet in only one way: the owner operates it, and the owner bears the consequences.
| Municipal public toilets (G-end) | Service areas / hubs / hospitals / commercial (B-end) | |
|---|---|---|
| Who pays | Public finance | The operating entity itself |
| Who operates | Outsourced to a sanitation company | The owner's own team |
| Who bears the consequences of “it does not work” | Essentially nobody | Complaints, loss of traffic, points deducted in appraisal |
| Acceptable evaluation indicators | Item count, total price, the acceptance form | Satisfaction, energy use, labor saved, time to resolution |
| Dimension of competition | Price | Results |
This table is the core of this report. It narrows the sentence “the market is not healthy” to one sentence:
So the phrase “the market has rotted” in our original judgment is not precise enough. The accurate statement is: the G-end has rotted, the B-end has not, and the B-end may be the only place in this industry where product competition still exists.
Guangzhou Metro meets every definition of the B-end in this section: it operates itself, it bears the consequences itself (passenger complaints, service appraisal), it has a technical department, it has a budget, and it has already done one round of a high specification. On the table above, it should be the customer most willing to pay for results.
But the fact recorded in Section 08 is this: the configuration on the new extension was cut from nine items to two, operations and maintenance as a whole was handed to the M&E company, and maintenance of the old system stalled. What it did is the same thing the G-end does.
The table still needs one more condition: for the B-end to compare results, the owner has to be responsible for maintenance itself. Once operations and maintenance as a whole is outsourced to a general M&E contractor, the B-end's scoreboard degrades into the G-end's scoreboard — the party that takes over prices by “whether the equipment is broken,” not by “whether the data is useful.”
This also explains why we said “needs correction” in Section 01 — it is not a wording problem. It changes the action. If the whole market has rotted, the conclusion is to exit. If the G-end has rotted and the B-end is alive, the conclusion is to change the customer, not to change the industry.
But “change the customer” has to be said more specifically. On the analysis in Section 08, what we actually have to find is not a generic “B-end.” It is an owner that has operations-and-maintenance capacity, or that is willing to keep the operations-and-maintenance function. Within rail transit, an owner with its own maintenance crew and an owner that outsources the whole of it to an M&E company are facing two different markets. Within large enterprises, handing the system to the information center or to the logistics department also produces different results. Before signing, asking clearly “who will repair this system afterwards” judges whether a project suits us better than asking only about the budget.
12The loop: why this outcome is inevitable
String the eight pieces of evidence together and a self-sustaining loop appears. Nobody designed it, but it turns by itself.
The most vicious part of this loop is step ⑧. When the old system breaks it is not repaired. A new build or a renovation is applied for directly — because “repair” has no budget line, and “build” has a special fund. So each round of “pseudo-scrapping” is not a loss. It is the source of the next round of orders.
[Inference] This means nobody in the industry has an incentive to maintain the old system. The equipment vendor hopes it breaks (easier to sell a new one). The integrator hopes it breaks (easier to take the renovation). The client hopes it breaks (easier to apply for budget). The only party that hopes it does not break is the citizen who uses it, and the citizen is not at the table.
Section 08 adds a layer of explanation to this loop: after ⑧, the next round's configuration shrinks back along the line of “whether a post can catch it.” Nine items becoming two is not an exception. It is the necessary result when this loop turns a second time — the data left by the first turn had nobody to use it, so the second turn does not buy it.
So this loop cannot be broken by “raising product quality,” and it cannot be broken by “strengthening after-sales.” There are only two places to act: the bid-evaluation rules at ⑤, and the payment structure at ⑥. And that is the whole content of the recommendations in the next section.
13Why technology becomes a liability
The previous section was the market's loop. This section is our own. Because we have been inside this loop, and paid the tuition, we came to understand one thing — here, a strong technical capability is not an advantage. It is a handle.
13.1 Say the most unpleasant part first: on the project site, nobody cares
We used to have a default premise: if the product is truly easier to use, more stable, and saves the operations side more money, the customer will recognize it sooner or later. That premise holds in other industries. It does not hold here.
This is not the complaint that “the customer cannot tell good from bad.” It is that four roles each do not need this:
| Role | What his appraisal indicator is | How “whether the equipment is good” affects him |
|---|---|---|
| The buyer (urban management / sanitation authority) |
Finish on time, stay within budget, pass acceptance, have no safety incident | Not on the appraisal form. And his tenure in the post is often shorter than the time it takes for the equipment to reveal its problems. During his tenure the equipment is “accepted as qualified.” After he leaves it is “faulty year after year” |
| Construction / integrator | Quote − purchase cost − schedule − rework | Negatively correlated. More stable equipment means a higher purchase price, longer commissioning, and more documents to write. As long as it does not fail in batches during the warranty, it is good equipment to him |
| The operations party (sanitation service company) |
Cleaning-quality appraisal: floors, odor, consumables, complaints | Irrelevant. The equipment is the client's asset. If it breaks, a repair request carries no liability; if it cannot be repaired, no money is deducted (what is appraised is cleaning, not the online rate). He also has no way to judge “whether the product is poor or the installation is poor” |
| The user (the citizen) |
None | The only person who truly cares. But with no purchasing power, no repair channel, and no comparison sample, the only choice is “push the door and see whether there is a free stall” |
This table explains a question we could not make sense of for a long time: why is our product more stable on site than other people's, and yet the customer gives no feedback? It is not that the customer did not see it. It is that nobody is appraised on this item.
13.2 An account that can be calculated
Translate “taking the product seriously” into financial language, and it looks like this (the following is our own calculation, [Estimate]):
| Item | Value | Note |
|---|---|---|
| One-off R&D investment | About 30 ten thousand yuan | 2 people × 6 months: hardware redesign, firmware, aging verification, documentation |
| BOM increment | +120—180 yuan per set | Wide-temperature parts, protection and isolation, a watchdog, shielding and filtering |
| Extra commissioning labor per set | +1—2 person-days | More functions; they have to be tuned; a commissioning record has to be written |
| Amortized over 300 sets | About 1,000 yuan per set | 30 ten thousand yuan ÷ 300 |
| Total cost increment | About 1,100—1,200 yuan per set | This does not yet count the cash tied up by a longer lead time |
| What the market will pay extra for this | 0 yuan | The acceptance checklist does not measure this item, and the scoring sheet has no column for it |
| Net result | −1,100—1,200 yuan per set | A structural loss. It has nothing to do with how well the work is executed, and nothing to do with how hard anyone tries |
Look at the last row. This is not “the investment has not yet reached the harvest.” It is also not only “educating the market takes time.” It is an account whose result is negative. The more seriously the product is made, the higher the cost per set. The selling price is very hard to raise, because the scoring items contain no corresponding indicator.
Calculated on this table, what we were actually building is “the opposite of cost leadership” — spending a higher cost to buy an indicator that nobody is looking at.
13.3 Why it is 0: at the moment of the deal, good and bad are the same price
The hardest point to accept is this: on the day of acceptance, a good product and a bad product look exactly the same.
Both power on, both produce numbers, both can be ticked, both can be signed for. To see the difference takes three things: two public toilets of the same scale, the same climate, and the same traffic as a control; online-rate data for more than two years continuously; and the ability to separate “an equipment problem” from “an installation problem, a network problem, and nobody looking after it.” Of these three, there is not one.
Look at where the vertical lines sit. The moment the difference starts to be obvious (about 24 months) is almost the moment the warranty expires (24—36 months). Problems inside the warranty are repaired by the vendor, so “it works” covers up “it is unstable.” The moment the warranty expires, repair responsibility is drawn away under the contract, and operations and maintenance has no corresponding budget line, so the curve falls off a cliff. Just when quality starts to speak, the people who would listen have all left.
This is why “easy to use” cannot be priced in this market. It is not a price problem, and it is not a problem of persuading the customer. It is a problem of the observation window — the window does not exist at all.
13.4 This is not “the customer cannot tell good from bad.” It is a credence good, in the economic sense
Later we found a statement that is more accurate than “the customer does not understand,” and that explains more:
- Search goods: you can judge before you buy (the cut of a piece of clothing)
- Experience goods: one use tells you (the taste of a restaurant)
- Credence goods: even after use you still cannot judge (a lawyer's service, the quality of a repair)
A smart public toilet belongs to the third kind, credence goods, and this feature is especially pronounced. A citizen can feel that “this screen is useless,” but cannot judge that “the false-alarm rate is 8 percentage points higher than a peer's.” The operations party knows “the equipment has broken again,” but cannot tell whether the cause is the product, the installation, the network, or a lack of maintenance. In this chain, no link can pass quality information back to the buyer.
In economics this is called a market for lemons: when the buyer cannot observe quality, the price mechanism systematically drives out high-quality supply — it is not that the inferior product beat the superior product. It is that the superior product cannot prove that it is superior, and so cannot recover its cost.
We used to think this was “the industry is still early, and it will slowly get better.” As it now looks, a credence-good market does not improve by itself. It needs a measurement mechanism built from outside. That is exactly the four indicators in Section 16.
13.5 Our own trap: the stronger the technical capability, the fewer product orders we can get
Tongwei has a problem of its own. Because we can do things others cannot, we often meet a conversation like this:
“Yes.”
Every time we take one, it becomes a piece of revenue. But strung together, it is a loop:
change it for us” ④Take the customization ⑤Every order is developed from scratch ⑥It does not settle into a product ⑦No reuse ⑧Gross margin does not rise ⑨No resources left to build a product ⑩Can only keep taking customization
After step ⑩ it returns to step ② — so every step in this loop is right, and strung together it turns in place.
This loop is more hidden than the market loop outside. Each deal makes sense on its own: the customer has a requirement, we can do it, there is revenue, and the customer is satisfied. But strung together, customization projects keep increasing, experience and code do not settle into a reusable product, and in the end we are still turning in place.
And it has a self-reinforcing side effect: the more strange requirements we can take, the more easily we are introduced to the next person with a strange requirement. Reputation here becomes a burden — not “this company's product is good,” but “this company can change anything.” The first brings repeat purchase. The second brings customization.
[Fact] This also explains a phenomenon mentioned earlier: our capability is described as “miscellaneous.” We can take all kinds of field protocols and strange schemes. Where a market is mature, “miscellaneous” is a barrier. In this market, “miscellaneous” is the entrance to being customized.
13.6 Then what is technology still good for: it buys the ticket, not the price
At this point it is easy to swing to the other extreme — then stop doing technology. That is also wrong. Technology is not useless in this market. Its use is not the use we thought:
| What a technology investment can buy here | Whether it can | Nature |
|---|---|---|
| Bid qualification (number of software copyrights, test reports, case list) | Yes, and it is required | Defensive — without it you cannot enter the field |
| Technical score (soundness of the proposal, product maturity, after-sales plan) | Partly yes, but it is usually only 30%—50% of the score, and it is subjective | Defensive — it does not open a gap |
| Fewer return repairs and fewer site visits during the warranty | Yes. It directly saves our own money | Defensive — an internal gain the customer cannot see |
| A higher quote | No | — |
| More repeat purchases | No (procurement is project-based, not repeat-purchase-based) | — |
Therefore, a technology investment should be managed as a “qualification cost,” and only the minimum required to meet the requirement should be spent; it should not be managed as a “product investment,” chasing a lead over the industry. The budget logic of the two kinds of spending is completely different: the first is “stop when it is enough,” the second is “add when it is not enough.” In the past we kept spending on the second logic, and received only the return that belongs to the first logic.
The most important sentence in this section
The price of technology = the strength of the penalty.
The same technology, written into a contract that says “deduct payment if the online rate is below 95%,” is immediately worth money. Written into a checklist that says “configure one stall-guidance system,” it is only a cost.
So what we oppose is not “building a product.” It is building a product where there is no penalty. That is the entire point of the four proposals in Section 16 — not to make the industry more sentimental, but to fit it with penalties.
It can prove: under the bid-evaluation and acceptance rules as they stand, the financial result of “taking the product seriously” is negative, and that negative value is structural (the cost is determined, the premium is zero). It does not change with how hard anyone tries. This explains why technology companies in this market fall behind instead — it is not that they did it wrong. It is that they are doing something that is not priced.
It cannot prove: that technology is useless. On the B-end (service areas, hubs, hospitals) and in contracts that carry a penalty for breach, technology still has value (see Section 11). It also cannot be used to decide that every technology investment should stop — the spending required to obtain bid qualification still has to be kept.
14A clearer conclusion on the state of the industry
The direction of our original judgment was not wrong, but three wordings can mislead a decision. After putting the report's material together and looking back at past projects, we see it more clearly.
Correction 1: not “it rotted,” but “it never grew up”
“Rotted” implies a premise — that it was once good. What we found is that there was no such stage. When Shanghai issued the guidelines in 2019, the industry's own words were “because the corresponding standards were lacking, the products provided by each builder were not the same.” 2021—2023 was the construction peak, and in the same period “an online rate under 30%” already appeared. In 2026, the industry is still defining rank by buying advertorials.
There was no period that was healthy. So the correct statement is: this market has never reached a scale that can sustain a technology investment, and so it has never entered a stage of product competition.
Why the distinction matters: saying “it rotted” makes a person think “wait until it is regulated, then enter.” Saying “it never grew up” makes a person think “it may never be regulated, and the only move is to go around it.” Only the latter is a judgment that can be acted on.
Correction 2: technical competition did happen. There was just no scoreboard
We originally said “it competed on price before it had entered healthy competition on technical proposals.” That is not accurate. The sensing layer went through three generations in six years:
| Generation | Time | Technology | The problem it solved |
|---|---|---|---|
| First generation | Around 2019 | Infrared sensing | It can only detect “occupied / vacant,” misjudges when the person is still, and is easily disturbed by temperature, humidity, and light |
| Second generation | 2022—2024 | Laser TOF | Continuous scanning; a stationary body can also be detected; not affected by light or temperature. Communications moved to LoRa/4G |
| Third generation | 2025 to the present | Millimeter-wave radar, sonar | Contactless, can detect the micro-motion of breathing, false-alarm rate down to 0.1%—0.5% |
Source: an industry technology survey article (2026), including indicators stated by vendors themselves. Confidence in the indicator portion: medium.
The technology really is advancing. Sensing accuracy going from “often misjudged” to “a 0.1% false alarm” is a solid product upgrade. But the client does not measure this item. What the acceptance checklist writes is “configure one stall-guidance system.” It does not write “false-alarm rate ≤0.5%.” So the cost brought by the upgrade cannot be turned into a price.
The result is: nobody is willing to be the first to upgrade. Because an upgrade adds 200 yuan of cost, and the client will not pay 300 yuan more for that 200 yuan — at acceptance he will only ask “is this item present.”
So the problem is not “there is no competition.” It is “competition happened, and it was not scored.” This means what we need is not to keep raising the technology for its own sake. It is to get the technical result into the evaluation system.
Correction 3: not “after-sales do not matter,” but “after-sales stops at the boundary of the warranty”
This distinction is critical, because it decides how we should design the business model.
| Original judgment | What is actually the case | Evidence |
|---|---|---|
| After-sales do not matter | During the warranty it is handled strictly: a 3-year warranty, 7×24 response, arrival within 4 hours, resolution within 48 hours, a spare-unit service — these terms are written into the contract, with penalties for breach | The original contract text of the Yuelu (Changsha), Yulin, Chongzhou, and similar projects |
| — | After the warranty expires, all the contract promises is “preferential supply of spare parts” and “charging at cost” | Same as above |
| — | There is no budget line called “system operations and maintenance,” and no unit-price standard | The service-scope lists in public-toilet operations-and-maintenance tenders in various places |
So it is not that vendors are irresponsible. It is that responsibility is drawn by the contract as a precise line, and on the far side of that line nobody pays. The smart parts taken out in Section 09 all happened on the other side of that line.
This correction matters enormously to Tongwei: what we have to sell is not “better after-sales.” It is “after-sales that someone pays for.” These are two completely different things. The first depends on service attitude. The second depends on commercial design.
The full judgment after correction
The smart restroom is a market that has never reached the scale required for technical competition. Its standards are checklists, its acceptance is counting items, its operations and maintenance has no line of its own, and the party that pays is separated from the party that uses it.
It therefore necessarily converges on “pile up the item count + press the unit price + deliver once,” and it systematically degrades after warranty. This is not a problem of practitioners. It is an equilibrium jointly determined by the scoreboard and the payment structure.
This equilibrium is stable on the G-end (municipal fiscal procurement). It does not hold on the B-end (owner-operated). So the way out is not “make the product better.” It is “change the customer” or “change the rules.”
15What this judgment means for Tongwei
If the analysis above is right, then there are four things we can no longer do.
Four things we will not do
| Will not do | Reason | Who is doing it |
|---|---|---|
| No turnkey work (prefabricated structure, civil works, fit-out) | That is the battlefield of construction companies and prefabrication plants. What is competed on is qualifications, advancing funds, and construction organization, not electronics capability | Construction companies such as Guizhou Wanshengda and Hangzhou Baixing |
| No platform | Under checklist acceptance the platform is a “mandatory item,” but it produces no premium. The annual fee of 1—5 ten thousand yuan cannot be collected (Section 07) | Integrators, operators |
| No “more accurate sensor” | An improvement in accuracy cannot be scored (Correction 2 in Section 14), and the investment cannot be recovered | A few full-stack in-house vendors |
| No direct sales to the client | What the client buys is “a building,” not “a system.” We have neither construction qualifications nor the ability to advance funds | — |
Then what to do: turn “acceptance” into the product
This is the conclusion drawn from the analysis above. Since, in this market, the first thing a product has to solve is “whether it can pass acceptance,” we make the ability to pass acceptance part of the product, and at the same time push price and delivery cost down as far as we can.
The concrete form: a configurable in-stall monitoring unit (including a gateway), supplied white-label to integrators, prefabrication plants, and contractors who take on M&E maintenance, with an automatically generated acceptance-document pack delivered with the goods.
Product definition (three things)
① Full checklist coverage. Against the 61 items of the Shanghai guidelines and the functional composition of the Chongqing local standard, make a configuration that can be ticked — whatever the customer selects is what leaves the factory, no more and no less.
② Documents generated automatically. Each unit ships with a function cross-reference, a point diagram, a commissioning-record template, and an acceptance self-check form. The integrator's crew can pass acceptance by filling them in.
③ A three-year spare-parts pack sold once. No annual fee. “Three years of spare parts + remote diagnosis” is quoted as a single package, avoiding the situation in Section 07 where the platform's annual fee is higher than the hardware.
Why it is us
Heterogeneous protocols. Brands on a public-toilet site are mixed: one vendor for sanitary ware, one for deodorization, one for water meters, and the client also requires a connection to the sanitation platform. This is our trade.
A harsh environment. A restroom is humid, and there is corrosion from ammonia and cleaning agents. We have long done industrial field networking. Protection and wide-temperature design are basic capabilities.
Cost structure. We do embedded work. We do not run an SMT line and we do not tie up a production line. With a domestic MCU plus general-purpose sensors, we can press the BOM to a place others cannot reach.
A cost account
[Fact] The publicly listed channel price: a complete sensing-hardware set covering 10 stalls (door-lock sensor, indicator light, ammonia, hydrogen sulfide, temperature and humidity, footfall, water-meter and electricity-meter interfaces, gateway) totals about 6,236 yuan. The listed online price of one stall's occupied/vacant sign plus sensor is only a little over 200 yuan.
[Estimate] Our BOM breakdown (10 stalls):
| Item | Our estimated BOM | Note |
|---|---|---|
| Stall detection ×10 (millimeter-wave or laser TOF + MCU) | 300—450 | A domestic solution, modular |
| Stall indicator ×10 | 100—150 | A general-purpose part |
| Environmental detection ×3 (ammonia / hydrogen sulfide / temperature and humidity, a three-in-one module) | 150—240 | Electrochemical + digital temperature and humidity |
| Footfall ×2 | 60—100 | Infrared beam-break or ToF |
| Gateway ×1 (including LoRa/485/4G, can connect water and electricity meters) | 180—280 | Our main control board |
| Structural parts, cable, packaging | 80—120 | — |
| Total BOM | 870—1,340 | 78%—86% below the channel list price |
[Inference] If the ex-factory price is set at 2,200—2,800 yuan (10 stalls), gross margin is about 55%—65%, and it is still 55%—65% below the market list price. An integrator has a reason to adopt our scheme: the quote can stay the same, while cost falls sharply. We can also keep a profit at a lower unit price.
This is how we step around the price war: not by staying out of it entirely, but by competing at another layer. The price war at the turnkey layer, in turn, brings us demand.
16Market proposals: change the way projects are organized, not the slogans
The four items below are proposals we make in public, for people who are willing to push for change. They are not moral appeals. They are engineering measures that can be put in place.
Proposal 1: change acceptance from “item count” to “four indicators”
Checklist acceptance is the root of the price war (Section 05). To break it, the checklist does not have to be abolished. Outside the checklist, four measurable numbers only have to be added:
| Indicator | Definition | Threshold (proposed) | How to measure |
|---|---|---|---|
| Equipment online rate | Devices online in the statistical period / devices installed | ≥95% (monthly) | Platform logs, exportable, verifiable by a third party |
| Time to close an anomaly | Median time from a system alarm to human confirmation that it is cleared | ≤4 hours (odor / overflow) ≤24 hours (ordinary faults) | Work-order system timestamps |
| Repeat-anomaly rate | Recurrences of the same type of anomaly at the same stall within 30 days | ≤2 times | Same as above |
| On-time consumable replenishment rate | Share of replenishments completed within the promised time after a shortage alert | ≥90% | Alert records + replenishment records |
These four indicators can all be generated by the system automatically, with no extra manual measurement. They also cannot be met by “installing one more sensor.” The system has to actually run, and someone has to deal with anomalies in time.
[Fact] This kind of practice already has a precedent: Indore, India, a project of 350 IoT public toilets, planned a mechanism that “notifies progressively higher managers when an anomaly is not cleared within the specified time,” and required an event to leave five timestamps: occurrence, dispatch, arrival, handling, and clearance. They wrote one summary explicitly: an alert is not an improvement.
Proposal 2: give operations-and-maintenance funds a line of their own
The present state: the 7.8—14.9 ten thousand yuan a year spent to run each public toilet is all inside the envelope called “cleaning services.” Not one yuan is designated for the system.
The proposal, outside the cleaning-service contract, is to list a separate item, “smart-system operations and maintenance,” and to give a reference unit price:
- Priced per stall: 300—500 yuan per stall per year (about 3,000—5,000 yuan a year for 10 stalls)
- Or priced on the total equipment price: 8%—12% a year (a little above the industry's current 5%—8%, because it has to cover the platform and remote diagnosis)
- The service period runs with the cleaning contract (usually 2—3 years), appraised separately, paid separately
The fiscal effect of this spending is small: a public toilet's annual operations and maintenance of 10 ten thousand yuan, plus 4,000 yuan, is only 4%. But once this money exists, “whether the system can keep running” no longer depends on luck. It is written into the contract.
Proposal 3: write open interfaces into the acceptance conditions
[Fact] The industry's own account: early projects “mostly used the vendor's private closed protocols, equipment software and hardware were deeply bound, and a third-party organization could not connect or upgrade.” This is one of the main causes of “pseudo-scrapping.”
The proposal is to write three clauses so they cannot be bent:
- At bidding, a complete communications-protocol document and data dictionary must be submitted as part of the technical documents. They are not returned if the bid fails.
- At acceptance, one live test of integration with a third-party platform must be completed (even if it is only pushing data to a test platform). No pass, no acceptance.
- The contract shall stipulate: when the vendor stops service or exits the market, it shall provide the last firmware and interface documents at no charge.
These three clauses add no hardware cost, but they stop the whole asset being locked to a single supplier. For the client they are pure gain. For a poor supplier they are a disaster — and that is exactly why they work.
Proposal 4: separate warranty from operations and maintenance, and tender operations and maintenance on its own
Now the warranty is 2—3 years and operations and maintenance is 0 years, with a cliff between them. The proposal is to change it to “3 years of warranty + 3+2 years of operations and maintenance,” and the operations-and-maintenance contract is tendered separately or renewed separately, not bundled into the equipment purchase.
This has a side effect, and it is a good one: tendering operations and maintenance on its own will bring forth a group of companies that do only operations and maintenance. They do not sell equipment. They sell “keeping the system alive,” and they charge by online rate and by time to close the loop. Once this role exists, the quality of the equipment will actually be appraised — because an operations-and-maintenance company will refuse to buy something that is always broken.
1712-month actions and stop-loss lines
Whether the judgment is right has to be verified, in the end, by doing it. The following is our own plan, not advice for anyone else.
| Stage | Time | Action | Acceptance standard |
|---|---|---|---|
| Step 1 Find partners |
2026.11—12 | Find 2 integrators or prefabrication plants that have already won smart public-toilet projects, and discuss supply of a “white-label unit + acceptance document pack” | Sign 1 trial-supply agreement (it need not be exclusive, and it need not commit to volume) |
| Step 2 Build a sample |
2027.01—02 | Build 1 set of a 10-stall unit and install it in a partner's real project (free or at cost) | It runs once installed, and the partner passes a self-check against his own acceptance standard |
| Step 3 Make the documents |
2027.03 | Turn the whole of this acceptance into an “acceptance cross-reference”: checklist item → our implementation → method of proof | One document, such that an unfamiliar crew can complete the acceptance paperwork by filling it in |
| Step 4 Get onto the list |
2027.04—06 | Finalize the quote and the three-year spare-parts pack, and get onto the approved-supplier lists of 2 integrators | Get onto the list + win the first formal order (even if it is only 20 sets) |
| Step 5 Follow the window |
2027.07—2028.06 | Follow the tender window created by the end-2028 compliance milestone (projects are usually released 12—18 months ahead) | Cumulative shipments above 200 sets, gross margin per set ≥50% |
Three stop-loss lines
2026-12-31
No trial-supply agreement with a partner signed → stop. It means our judgment was wrong: integrators do not need a cheaper unit, or our cost advantage does not hold.
2027-03-31
The sample is installed but fails the partner's acceptance self-check → rework it once; if it fails again → stop. It means the “acceptance pack” path does not work.
2027-06-30
Not on any approved-supplier list → stop, and do not add further investment. Switch to general embedded components, and do not touch this category.
The ceiling on investment
[Estimate] Investment for the whole of the first stage (through 2027-06) is held to 2 people × 6 months + a one-off trial production of 3 ten thousand yuan, about 20 ten thousand yuan in total. No tooling, no certification, no platform, no brand.
The basis of this ceiling is simple: if this judgment is right, 20 ten thousand yuan is enough to verify it; if this judgment is wrong, 20 ten thousand yuan is a loss we can afford.
In one sentence
This market will not get better because we do it better. It will get better only because someone starts measuring results.
Until then, there is only one thing we can do: inside its existing rules, make the part that is the cheapest, the least trouble, and the least likely to be taken out.
18Appendix: sources and confidence
The source and the degree of credibility of the key figures in this report are as follows. What can be checked is marked Fact. What is derived from facts is marked Inference. What we calculated ourselves is marked Estimate.
| Datum / conclusion | Type | Source | Confidence |
|---|---|---|---|
| Urban public toilets nationwide: 20.1 ten thousand; 3.55 per 10,000 people; 18.3 ten thousand directly administered; annual growth 2.81% | Fact | Statistical basis of the housing and urban-rural development authorities, end of 2025 | High |
| 2024 national fixed-asset investment in city-appearance and sanitation facilities: 403.4 hundred million yuan, +16.9% | Fact | Statistical-yearbook basis | High |
| By the end of 2028, public toilets in major commercial districts / scenic areas / hubs reach Class I standard | Policy | The upgrading campaign of the Ministry of Housing and Urban-Rural Development, cited from public reporting | Medium (the full original text has not been seen) |
| Cost of the smart portion per toilet: basic 1.5—3 ten thousand yuan, standard 5—10 ten thousand yuan, high-end 15—30 ten thousand yuan | Fact | Compiled from “2026 tender data” published by industry solution vendors | Medium (vendor figures, possibly on the low side to attract customers) |
| Channel list price of sensing hardware for 10 stalls about 6,236 yuan; occupied/vacant sign + sensor for one stall a little over 200 yuan | Fact | Public list prices of channels / manufacturers | Medium-high |
| Service-area smart restrooms: on the order of 30 ten thousand yuan in 2023; about 10 ten thousand yuan for the same scale in 2025 | Fact | This company's project records; 2025 is from inquiries in multiple places | Medium (a single case, not a statistical sample; the 2025 side is an inquiry figure, not a transaction price) |
| At a quote of 10 ten thousand yuan, the “spec not lowered” delivery cost is about 18.6 ten thousand yuan (150 stalls, both sides) | Estimate | Back-calculated by this company from cost items; the working is in Section 06. Of the gap, about 11.4 ten thousand yuan is profit to zero, and about 8.6 ten thousand yuan is the cost gap | Medium (the line items can be checked; a single-project sample; unit prices move ±15% with region and construction conditions) |
| Guangzhou Metro: three years ago the smart restroom had 9 items (occupancy sensing, lighting, air quality, temperature and humidity, hydrogen sulfide, footfall, large screen, automatic flushing, feedback); the 2026 extension keeps only occupancy sensing and smoking detection | Fact | This company's participation in the projects and on-site comparison records | Medium (a single owner, two points in time, sample size 1; the list follows the owner's requirements document) |
| From 2026, operations and maintenance is basically handed to the M&E company, and the manufacturer rarely takes part; maintenance and repair of the old system have basically stalled | Fact | Same as above | Medium (same as above) |
| The boundary of the configuration = the boundary of the post; an M&E contractor can catch only the half that “can be priced per piece” | Inference | Derived from the list changes and the transfer of operations and maintenance in Section 08 | Medium-high (the mechanism is internally consistent, but it has not been verified at the organization and contract level) |
| The markup handed to a middleman, 15%—25%, can be saved by selling direct; the market price falls about 42% a year | Estimate | The former is the range commonly used in the industry; the latter is converted from the case's −67% over two years | Medium |
| Nearly a hundred enterprises registered in China are involved in the smart public-toilet business; CR5 < 28% | Fact | Abstracts of industry research reports | Medium (the reports themselves are of ordinary credibility, but the direction agrees with the other evidence) |
| Annual addressable size 3—10 hundred million yuan | Estimate | Calculated in this report; the working is in Section 03 | Medium (sensitive to the renovation rate and the cost per toilet) |
| The “smart” portion is 5%—15% of the total cost of a newly built public toilet (early material often wrote 15%—25%, which is high) | Estimate | Derived by this company from project-cost breakdowns and channel list prices, and cross-checked against vendors' tender figures | Medium (the range is wide, and specific projects differ a lot) |
| One leader's annual revenue does not exceed 2,500 ten thousand yuan | Fact | The state of the industry as known from this company's contact with it (nobody in this category has passed 3,000 ten thousand yuan) | Medium-high (not a financial-statement figure, but the direction is clear) |
| A 15-person hardware team's annual cost is 300—450 ten thousand yuan; three years of platform investment is 1,200—1,800 ten thousand yuan | Estimate | At a full cost of 20—30 ten thousand yuan per person per year, plus tooling, type testing, and a trial run | Medium (labor cost moves ±20% with the city) |
| The Shanghai 2019 guidelines: 61 configurations in three tiers; the Chongqing 2022 local standard is the first case in the country; the 2023 group standard is a draft | Fact | Shanghai Landscaping and City Appearance Bureau, Chongqing Urban Administration Bureau, the group-standard platform of the China National Institute of Standardization | High |
| Public-toilet operations-and-maintenance unit prices: 7.78 ten thousand yuan (Yizhuang), 10.37 / 8.45 / 6.55 ten thousand yuan (three classes in Shuofang, Wuxi), 7.76 ten thousand yuan (Mianyang), 14.88 ten thousand yuan (Tianluhu), yuan per toilet per year | Fact | Local government-procurement tender notices and the original contract texts | High |
| Warranty of 2—3 years; the clauses after warranty are “preferential supply of spare parts” and “charging at cost” | Fact | Contract / tender documents of the Yuelu (Changsha), Chongzhou (Sichuan), and Yulin (Shaanxi) projects | High |
| After warranty, annual maintenance is 5%—8% of the equipment's total price; platform operations and maintenance is 1—5 ten thousand yuan a year | Fact | Quoting-basis notes published by industry vendors | Medium-high (a single source, but consistent with the logic of the contract terms) |
| Three smart public toilets in Laoshan, Qingdao: access control removed, the indicator light stays green, automatic flush swapped back to manual | Fact | Qingdao Daily, 2024-06-14, page 05 | High |
| Shengsi: guidance screen black, data not updated, today's water consumption constantly 0, electronic water meters still being procured | Fact | Reporting republished on the Shengsi County government website, 2025 | High |
| Smart sanitation terminals commissioned in 2021—2023 had an online rate under 30% two or three years later; “pseudo-scrapping” | Fact | The industry press's own account, 2026 | Medium-high (the industry's own account, with no third-party audit) |
| Indore: 350 IoT public toilets required 60 months of operations and maintenance; “an alert is not an improvement” | Fact | A public case commentary, 2026 | Medium-high |
| List of winning bidders (China Mobile Shaoxing, Zhongdian Hongxin, Guizhou Wanshengda, Zhangye Lanbiao, Zhongyunhui, Hangzhou Baixing) | Fact | The original texts of award-result notices on local government-procurement websites | High |
| Three quotes on Binhai Avenue, Zhoushan: 44.8 / 65.6 / 33.6 ten thousand yuan; the lowest price did not win | Fact | Winning-candidate announcement on the Zhoushan public-resource trading platform, 2026-06 | High |
| Three generations of sensing technology (infrared → laser TOF → millimeter-wave) | Fact | An industry technology survey, 2026 | Medium-high (the indicators are the vendors' own account) |
| After the service-area renovation, satisfaction 63%→92%, and more than 50 ten thousand yuan saved a year | Vendor's own account | A case published by a solution vendor | Low (not verified; for direction only) |
| The spread in market size from USD 1.39 hundred million to USD 248 hundred million | Fact | Comparison of abstracts of multiple public reports | High (the discrepancy itself is a fact) |
| “TOP1” advertorials on four news sites, from the same template | Fact | Comparison of public search results, 2026-10 | High |
| BOM 870—1,340 yuan, ex-factory price 2,200—2,800 yuan | Estimate | This company's internal calculation, not verified by trial production | Low (to be corrected after a prototype is built) |
| The per-set cost increment of “taking the product seriously” is about 1,100—1,200 yuan, and the market premium is 0 | Estimate | This company's internal calculation; the basis for a premium of 0 is that neither the acceptance checklist nor the scoring sheet has a corresponding item | Medium (the cost items can be checked; the premium item depends on how the rules are read) |
| A smart public toilet is a “credence good”; the quality signal cannot be passed back to the buyer | Inference | An analogy to economic concepts (search goods / experience goods / credence goods), not an empirical finding | Medium-high (a judgment about whether the concept applies, not a datum) |
| A bad product's online rate falls to 25%—30% after 24—36 months | Illustration | Extrapolated from the industry's own account that “the online rate is under 30% after two or three years”; the curve is illustrative, not measured | Low |
| Warranty of 2—3 years; after warranty, responsibility is drawn away under the contract | Fact | Original contract texts of the Yuelu (Changsha), Chongzhou (Sichuan), Yulin (Shaanxi), and similar projects | High |
What this report did not do
- We did not obtain any vendor's real financial data. No listed company in the industry discloses this business separately, so “leaders' annual revenue of 2—6 × 10 million yuan” is a calculation, and it may be off by more than a factor of two.
- We did not do site visits. Every “state after completion” comes from public reporting, not from what we saw ourselves. The reporting may be selective.
- The original quotations for the 2023 order and the 2025 order were not reconciled line by line. On the price curve in Section 06, one end is our project record and the other is inquiries in multiple places. The scale is the same, but the lists were not compared item by item, so the slope can only be an order-of-magnitude judgment and cannot be used as a precise figure.
- We did not verify the “acceptance pass rate.” We cannot judge how many projects “scraped through.” We can only infer it from clauses and cases.
- The sample leans municipal. Procurement rules in counties, scenic areas, and service areas differ greatly. The conclusions of this report hold most firmly for the municipal G-end, and they explicitly do not hold for the B-end (see Section 11).
This document is a position paper. Facts are marked with their sources. Cite the source when quoting. Do not quote it out of context