After the utility returns, the equipment-room energy curve steps up. The cooling starts again, and the UPS starts recharging the battery. A total meter cannot separate those two. Follow the single-line diagram first, and see which equipment each meter actually covers. Then mark the intervals to compare with the outage, the restoration, and the recharge.
Each of the four points has its own metering boundary
| Position | What is recorded | The boundary to confirm on site |
|---|---|---|
| UPS AC input | Input active energy | Whether the main input, a separate bypass input, and a separate auxiliary feeder are already covered |
| UPS AC output | Output active energy | Which loads this UPS actually supports |
| Battery DC side | Energy charged in and energy discharged, accumulated by direction | Whether the meter is at the battery or somewhere else, and whether every battery branch is included |
| Cooling supply circuit | Cooling active energy | Whether the cooling sits on the UPS output, and whether the report counts it twice |
Compare energy in kWh over the same start and end. Use kW to see how active power changes. Check the clock, the scale, the direction, and any missing interval on each meter first. On a model with a separate bypass, measuring only the main input will distort the difference in some operating modes.
Bidirectional battery energy is what makes the difference explainable
If the AC input, the AC output, and the battery branch already cover every energy path, and other energy stored inside the UPS can be ignored, the loss inside the boundary can be estimated as follows.
Loss inside the boundary ≈ AC input energy − AC output energy − energy charged into the battery + energy discharged from the battery
In one illustrative recharge interval, the UPS input is 120 kWh, the output is 108 kWh, and the net energy into the battery is 8 kWh. The estimated loss inside the boundary is about 4 kWh. That 8 kWh is energy that crossed the metering boundary toward the battery. If the point is at the battery, how much was lost inside the battery, and how much was actually stored, still has to be read from other data on the battery side. When the difference among the meters is small, also judge whether the error and the sampling gaps can support the estimate.
If only the AC input and output meters of the UPS are available, first pick an interval with stable supply, no clear charge or discharge, and a similar load, and watch the difference. For recharge and discharge intervals, mark that the battery side is not yet itemised. Write the conclusion first as the difference between input and output energy, and use it as the reason to add a meter later. When the points are not enough, do not call that difference a loss or a recharge.
A power-and-environment timeline can explain a change in the energy curve
Lay utility restoration, UPS mode, the start of recharge, and cooling start and stop onto the energy report, and the next branch to check often shows up. If the cooling circuit rises after the utility returns and then falls, while the battery is still recharging, the two curves can go separately to cooling maintenance and to power maintenance. When comparing days, choose intervals with a similar load, similar cooling conditions, and a similar UPS operating mode.
Tongwei Smart starts this analysis from a single-line diagram that marks the metering coverage. Put the energy meters and the UPS events on the same interval, and compare one normal float-charge stretch with one recharge after the utility returns. That shows which attributions the existing meters can support, and where the next meter should be added.